Frederick:
Thank you for the information.
Surely the Report will be shown in Court in the very first phase of the trial and at that point it will be public.
Warm Regards,
A.R.
WaltC:
Thank you for your suggestions.
Our policy, though, will not be oriented to “give proof that it works”, but to sell things that work. In this perspective, certifications are crucial. For industrial plants the certifications are done, for the domestic are not yet. Your suggestions are intelligent, though.
Warm Regards,
A.R.
Dear Andrea Rossi:
Thank you for your response to Frank Acland, that has been published also on Ecat World. By the way, I read on Ecat World also that the Judge has ordered the start of the trial on June 27 2017.
Do you think that at that point we will be able to see published the report of the ERV ?
Thank you if you can answer,
F.
Dear Andrea,
I’m not sure how compact the control electronics is for the QuarkX, however…
– would it be possible to make a small, portable, self-powered lantern using a QuarkX and a rechargeable battery for the power source?
If so, I thought it could be useful in 2 ways:
– One, short-term, as a simple “proof of concept demo” for potential customers. (“See, it really works– No external power source and it’s been shining like that for months.”)
– Two, longer-term, as a source of light (and heat?) for areas of the world where reliable electricity is a problem (this might include all sorts of casual and extreme camping situations).
Dear Andrea,
I understand your response but enjoy your second remark best: “priority is to make normal things at anomalous costs”.
Even snakes were used for good (imbeciles too). Moses’ bronze snake on a pole was used to heal the people when looked upon it as a reminder of their faith. This same symbol used today as a medical symbol for healing. (However, I don’t suggest putting imbeciles on a pole.)
Happy 4th of July!
Brokeeper
Frank Acland:
Independently from who is the imbecile that wrote such things, please find hereunder my answers, confined within the limits allowed not to touch issues that have to be discussed exclusively in Court, with due evidence.
a) The flowmeter used in the test is property of the ERV. The ERV has chosen that instrument based on his experience. It is, by the way, a very common flowmeter, that everybody can buy, even if it is quite expensive. The flowmeter has been certified and after the test the ERV has retrieved it and sent it to make a certification of its margin of error after the test of 1 year, specifically with a flow of water with the same temperature and the same flows of water that we had during the test, minimum, maximum, average. So the ERV told us he was going to do when he retrieved his flowmeter after the shut down of the plant at the end of the test.
PLEASE DO NOT FORGET THAT:
The ERV is a nuclear engineer, with experience of nuclear power plants and certification+validation of plants
b) Obviously it is false, otherwise the plant would have been closed after the inspections
c) False
d) Tragicomic: Leonardo Corporation delivered, as per contract, the plant on August 2013, and we were ready to start immediately the test, as a continuation of the preliminar test made in Ferrara two months before with IH. IH had 1 year of time to start the 1 year test, but they always delayed with the excuse that they did not have the authorization from the Healthcare Office of North Carolina, due to the fact that there was the “nuclear reactions” issue. I have been able to get such permission in Florida and therefore I proposed the Customer, that has been accepted by IH. Evidence of it is the contract that IH made with JM. Since the plant was in that period property of IH and it was in the factory of IH, obviously they could choose the Customer they wanted, if they had one.
e) When you have not the burden to give evidence of what you say, you can say every stupidity. This is exactly the case. Anyway, what counts related to the contract is the energy produced by the 1 MW E-Cat, and such energy gets evidence from the report of the ERV.
Warm Regards,
A.R.
Dr Rossi:
Please continue to turn a blind eye to the snakes that are trying to assassinate you, don’t lose your time with them and continue your great work.
The silent majority is with you, waiting patiently the E-Cat .
God bless you,
Scott
Byal:
Like Italy with Germany yesterday.
Yes, I take a doping that is not listed, so far, among the prohibited substances: I munch before the match a piece of the apples I received as a gift from the Snakes Union. But they are good not even for this. I mean the snakes.
Today, as well as tomorrow, we work on the QuarkX, but also will get some rest and fun.
Warm Regards,
A.R.
There are some accusations apparently coming from the IH group regarding the 1 MW plant test.
a) The flow meter used in the test was not fit for purpose
b) 1 MW plant did not have the required legal authorizations to work
c) JM Products did not have any employees
d) IH had proposed another customer to you, but you refused them
e) JM did not use the heat you produced in any manufacturing process, and the only heat supplied by your plant was 20kW, not 1MW
Mr Rossi:
How is gone your tennis match with your wife today ?
Maybe you can take some doping to make it better ?
Today is Sunday, tomorrow July 4th: take some fun !
Cheers,
Norman
To follow up on Dr. Fine’s questions, will the control system be able to transition light smoothly and evenly throughout its visual spectrum rapidly? If so, could you foresee this heralding in new light technologies?
Warm regards,
Brokeeper
The QuarkX can produce from 0% to 50% of its output as light.
1) Is the QuarkX light output modulated by (only) changing the operating temperature or by other control inputs?
2) Is/(are) the wavelength(s) of the light output tunable/controllable?
3) Does changing the light wavelength(s) impact the light output power?
That is, if the (peak) frequency of the light changes, does that cause a change in the percentage of the light output?
Since the E-Cat needs a constant external power input for safety reasons, does the E-Cat System have a built-in power conditioner? Is there an optional battery UPS box offered as an option as well?
The AC commercial power where I live is “dirty” in that we get occasional power surges that can destroy electronic equipment that is not protected by a heavy duty surge suppressor/battery backup system.
Best wishes for continued progress on your Magnus Opus.
Roberto Rampado:
The Customer has set up this plant in Doral, Florida, specifically on the purpose to test our technology for at least one year to see if it works, based on an agreement between him and Industrial Heat.
He knew from the beginning that, due to the experimental nature of the test, such test could have been stopped for any reason and the Agreement signed between him and IH says that the test could be stopped anytime without refunds of any kind could be vindicated by the Customer for the lack of production. He accepted, because for them too, as I said, this was a test.
Warm Regards,
A.R.
Egregio Dr Andrea Rossi,
Una domanda forse un po’ impertinente: la Ditta JM Products che fonte di calore utilizza attualmente, visto che il MegaGatto è chiuso e sigillato?
Grazie e Buon lavoro.
Rampado Roberto
Dear Dr. Andrea Rossi,
Which source of energy currently uses the company JM Chemical Products, since the MegaCat is closed and sealed upon agreement between your attorneys?
Thanks and good job.
Rampado Roberto
John Atkinson:
First and foremost:
I share what you said and wish a Happy July 4th to all our Readers in the USA !
The industrial E-Cats are now at the epicenter of the production that has already been certified and validated, while the R&D for all the other ptoducts will go on.
Allow me to correct you, though: we are not working to show to a bunch of useless guys how good we are. We are working to give to everybody the possibility of a new energy source cheaper and safer.
We are working to create jobs. We are working because we believe in what we do and to make everybody see the light of the E-Cats, not to enlighten persons who are paid to stay in the dark.
Besides, snakes are still God’s creatures and they made many useful things: for example, if it was not for them, mankind could not eat apples, while:
with one apple every day
keep the physician away.
( Patent Pending )
Warm Regards,
A.R.
Mr. Rossi.in your company’s corporate plan, What is your projected corporate unit sales and
Manufacturing projections in the next18 mos. I can’t wait to see those cats chasing off the snakes. God bless and happy 4th,for those of us in the States.
Dr Rossi:
I appreciate the way you simply ignore the insults arriving from your foes and go ahead along your path.
This gives the evidence that they are afraid, you are not.
Remaining in your field, which is the one of the serious things: which will be the first market sector that you will hit mostly at the beginning, which, if I have understood, is now ?
Godspeed,
C.
You mentioned last spring that you had orders for 3 1MW plants for your UK customer. Are those still being built or are you waiting for the QuarkX version? Any update on their delivery and installation?
The delivery time can vary between three and six months, depending on many factors. We do not have yet a massive production system in our factory.
Warm Regards
A.R.
It would appear that many agents of disinformation against you, appear to assume people have never read the sworn statement to the courts by your lawyer which very clearly states the IH Customer parent company was a UK registered company and not yourself.
1) Do all or some of certification plans for yor products have scheduled completion (+/-) days included in the process?
2) How did the certifier react to observing the QuarkX when he/she examined the small device?
3) How long for the certification officer to visit this time? (results +/-) …
4) Do they visit you now?
Your QuarkX is such an amazing and tiny package that I just have to ask.
Hi, Andrea:
Happy July 4th to you and all the readers of this great blog.
Thank you for your fight!
Henry
Eros:
Thank you,
Warm Regards,
A.R.
Dear Andrea Rossi:
I like your answer to Frank Acland.
Cheers,
Eros
Frederick:
Thank you for the information.
Surely the Report will be shown in Court in the very first phase of the trial and at that point it will be public.
Warm Regards,
A.R.
WaltC:
Thank you for your suggestions.
Our policy, though, will not be oriented to “give proof that it works”, but to sell things that work. In this perspective, certifications are crucial. For industrial plants the certifications are done, for the domestic are not yet. Your suggestions are intelligent, though.
Warm Regards,
A.R.
Dear Andrea Rossi:
Thank you for your response to Frank Acland, that has been published also on Ecat World. By the way, I read on Ecat World also that the Judge has ordered the start of the trial on June 27 2017.
Do you think that at that point we will be able to see published the report of the ERV ?
Thank you if you can answer,
F.
Dear Andrea,
I’m not sure how compact the control electronics is for the QuarkX, however…
– would it be possible to make a small, portable, self-powered lantern using a QuarkX and a rechargeable battery for the power source?
If so, I thought it could be useful in 2 ways:
– One, short-term, as a simple “proof of concept demo” for potential customers. (“See, it really works– No external power source and it’s been shining like that for months.”)
– Two, longer-term, as a source of light (and heat?) for areas of the world where reliable electricity is a problem (this might include all sorts of casual and extreme camping situations).
Thanks, WaltC
Brokeeper:
I agree.
Happy 4th to you,
Warm Regards
A.R.
Dear Andrea,
I understand your response but enjoy your second remark best: “priority is to make normal things at anomalous costs”.
Even snakes were used for good (imbeciles too). Moses’ bronze snake on a pole was used to heal the people when looked upon it as a reminder of their faith. This same symbol used today as a medical symbol for healing. (However, I don’t suggest putting imbeciles on a pole.)
Happy 4th of July!
Brokeeper
Scott Kevins:
Thank you for your sympathy,
Warm Regards,
A.R.
Peter Gluck:
Thank you for your link!
Warm Regards,
A.R.
Frank Acland:
Independently from who is the imbecile that wrote such things, please find hereunder my answers, confined within the limits allowed not to touch issues that have to be discussed exclusively in Court, with due evidence.
a) The flowmeter used in the test is property of the ERV. The ERV has chosen that instrument based on his experience. It is, by the way, a very common flowmeter, that everybody can buy, even if it is quite expensive. The flowmeter has been certified and after the test the ERV has retrieved it and sent it to make a certification of its margin of error after the test of 1 year, specifically with a flow of water with the same temperature and the same flows of water that we had during the test, minimum, maximum, average. So the ERV told us he was going to do when he retrieved his flowmeter after the shut down of the plant at the end of the test.
PLEASE DO NOT FORGET THAT:
The ERV is a nuclear engineer, with experience of nuclear power plants and certification+validation of plants
b) Obviously it is false, otherwise the plant would have been closed after the inspections
c) False
d) Tragicomic: Leonardo Corporation delivered, as per contract, the plant on August 2013, and we were ready to start immediately the test, as a continuation of the preliminar test made in Ferrara two months before with IH. IH had 1 year of time to start the 1 year test, but they always delayed with the excuse that they did not have the authorization from the Healthcare Office of North Carolina, due to the fact that there was the “nuclear reactions” issue. I have been able to get such permission in Florida and therefore I proposed the Customer, that has been accepted by IH. Evidence of it is the contract that IH made with JM. Since the plant was in that period property of IH and it was in the factory of IH, obviously they could choose the Customer they wanted, if they had one.
e) When you have not the burden to give evidence of what you say, you can say every stupidity. This is exactly the case. Anyway, what counts related to the contract is the energy produced by the 1 MW E-Cat, and such energy gets evidence from the report of the ERV.
Warm Regards,
A.R.
Dr Rossi:
Please continue to turn a blind eye to the snakes that are trying to assassinate you, don’t lose your time with them and continue your great work.
The silent majority is with you, waiting patiently the E-Cat .
God bless you,
Scott
Lucy:
Never.
Warm Regards,
A.R.
Brokeeper:
I am not able to answer now, but that will not be a priority. The priority is to make normal things at anomalous costs.
Warm Regards,
A.R.
Byal:
Like Italy with Germany yesterday.
Yes, I take a doping that is not listed, so far, among the prohibited substances: I munch before the match a piece of the apples I received as a gift from the Snakes Union. But they are good not even for this. I mean the snakes.
Today, as well as tomorrow, we work on the QuarkX, but also will get some rest and fun.
Warm Regards,
A.R.
Tom Wrench:
Working hard to get it.
Warm Regards,
A.R.
Dear Andrea,
A small EGO OUT issue from the series 12 Labors of JR 1- the Flawmeter
http://egooutpeters.blogspot.ro/2016/07/jul-03-2016-lenr-is-hidden-in-details.html
HAPPY JULY 4TH TO ALL OUR US READERS!
Constant Friends and temporary Enemies alike!
Peter
Dear Andrea Rossi:
There are some accusations apparently coming from the IH group regarding the 1 MW plant test.
a) The flow meter used in the test was not fit for purpose
b) 1 MW plant did not have the required legal authorizations to work
c) JM Products did not have any employees
d) IH had proposed another customer to you, but you refused them
e) JM did not use the heat you produced in any manufacturing process, and the only heat supplied by your plant was 20kW, not 1MW
Can you respond to any of these points?
Thank you,
Frank Acland
Dear Dr Andrea Rossi:
Are you approaching the 5 Sigma with your tests on the QuarkX?
Godspeed,
Tom
Mr Rossi:
How is gone your tennis match with your wife today ?
Maybe you can take some doping to make it better ?
Today is Sunday, tomorrow July 4th: take some fun !
Cheers,
Norman
Dear Andrea,
To follow up on Dr. Fine’s questions, will the control system be able to transition light smoothly and evenly throughout its visual spectrum rapidly? If so, could you foresee this heralding in new light technologies?
Warm regards,
Brokeeper
Dr Andrea Rossi,
Did IH find any other customer ready to make the test with the 1 MW plant ?
Thank you,
Lucy
Dr Joseph Fine:
1- by other
2- yes
3- no (energy conservation principle)
Warm Regards,
A.R.
Dear Andrea Rossi,
The QuarkX can produce from 0% to 50% of its output as light.
1) Is the QuarkX light output modulated by (only) changing the operating temperature or by other control inputs?
2) Is/(are) the wavelength(s) of the light output tunable/controllable?
3) Does changing the light wavelength(s) impact the light output power?
That is, if the (peak) frequency of the light changes, does that cause a change in the percentage of the light output?
Curious regards,
Joseph Fine
Daniel G. Zavela:
I know the problem and our control system is designed to prevent it.
Warm Regards,
A.R.
Dear Dr. Rossi,
Since the E-Cat needs a constant external power input for safety reasons, does the E-Cat System have a built-in power conditioner? Is there an optional battery UPS box offered as an option as well?
The AC commercial power where I live is “dirty” in that we get occasional power surges that can destroy electronic equipment that is not protected by a heavy duty surge suppressor/battery backup system.
Best wishes for continued progress on your Magnus Opus.
Best Regards,
Daniel G. Zavela
Iggy Dalrymple:
Sorry, I cannot give information, so far, related to our Partner.
Warm Regards,
A.R.
Roberto Rampado:
The Customer has set up this plant in Doral, Florida, specifically on the purpose to test our technology for at least one year to see if it works, based on an agreement between him and Industrial Heat.
He knew from the beginning that, due to the experimental nature of the test, such test could have been stopped for any reason and the Agreement signed between him and IH says that the test could be stopped anytime without refunds of any kind could be vindicated by the Customer for the lack of production. He accepted, because for them too, as I said, this was a test.
Warm Regards,
A.R.
Egregio Dr Andrea Rossi,
Una domanda forse un po’ impertinente: la Ditta JM Products che fonte di calore utilizza attualmente, visto che il MegaGatto è chiuso e sigillato?
Grazie e Buon lavoro.
Rampado Roberto
Dear Dr. Andrea Rossi,
Which source of energy currently uses the company JM Chemical Products, since the MegaCat is closed and sealed upon agreement between your attorneys?
Thanks and good job.
Rampado Roberto
Dear Dr Rossi,
Is your new partner a major manufacturer?
Best regards,
Iggy
John Atkinson:
First and foremost:
I share what you said and wish a Happy July 4th to all our Readers in the USA !
The industrial E-Cats are now at the epicenter of the production that has already been certified and validated, while the R&D for all the other ptoducts will go on.
Allow me to correct you, though: we are not working to show to a bunch of useless guys how good we are. We are working to give to everybody the possibility of a new energy source cheaper and safer.
We are working to create jobs. We are working because we believe in what we do and to make everybody see the light of the E-Cats, not to enlighten persons who are paid to stay in the dark.
Besides, snakes are still God’s creatures and they made many useful things: for example, if it was not for them, mankind could not eat apples, while:
with one apple every day
keep the physician away.
( Patent Pending )
Warm Regards,
A.R.
Mr. Rossi.in your company’s corporate plan, What is your projected corporate unit sales and
Manufacturing projections in the next18 mos. I can’t wait to see those cats chasing off the snakes. God bless and happy 4th,for those of us in the States.
Peter Metz:
Let’s talk of things when they are made and in operation.
Warm Regards,
A.R.
Anonymous:
Centralized heating.
Thank you for your sympathy.
Warm Regards,
A.R.
Peter Gluck:
Thank you for your link,
Warm Regards,
A.R.
Dear Andrea,
Issue of my Blog:
http://egooutpeters.blogspot.ro/2016/07/jul-02-2016-functional-understanding-of.html
UEFA 2016 today: Forza Italia!
peter
Dr Rossi:
I appreciate the way you simply ignore the insults arriving from your foes and go ahead along your path.
This gives the evidence that they are afraid, you are not.
Remaining in your field, which is the one of the serious things: which will be the first market sector that you will hit mostly at the beginning, which, if I have understood, is now ?
Godspeed,
C.
Dear Andrea Rossi,
You mentioned last spring that you had orders for 3 1MW plants for your UK customer. Are those still being built or are you waiting for the QuarkX version? Any update on their delivery and installation?
Thanks.
Sincerely,
Peter Metz
Tom Conover:
1- No and this factor does not depend on me.
2- I prefer not to answer
3- Sorry, I do not understand
4- Yes
Warm Regards
A.R.
The delivery time can vary between three and six months, depending on many factors. We do not have yet a massive production system in our factory.
Warm Regards
A.R.
Ada:
Yes
Warm Refards
A.R.
Engineer48:
I do not comment issues to be discussed in Court.
Warm Regards
A.R.
Dear Andrea,
It would appear that many agents of disinformation against you, appear to assume people have never read the sworn statement to the courts by your lawyer which very clearly states the IH Customer parent company was a UK registered company and not yourself.
http://a.disquscdn.com/uploads/mediaembed/images/3885/7420/original.jpg
All people need to read is the very clear last sentence of the linked image, which is from the last page of your complaint.
Dr Andrea.
Will be other industrial E-Cats in operation for your customers within 2016?
Thank you
Dr Rossi
Can you say what the expected wait time is for delivery of the 1 MW reactors for which you are currently accepting orders.
Thanks
Larry
Dear Andrea,
1) Do all or some of certification plans for yor products have scheduled completion (+/-) days included in the process?
2) How did the certifier react to observing the QuarkX when he/she examined the small device?
3) How long for the certification officer to visit this time? (results +/-) …
4) Do they visit you now?
Your QuarkX is such an amazing and tiny package that I just have to ask.
Thank you,
Tom
KP:
Still very promising.
Warm Regards,
A.R.
Matthew:
No.
Warm Regards,
A.R.
Dear Andrea,
If you can answer: is your new Partner also at the same time a customer who ordered one or more of Leonardo’s plants ?
Thank you,