Ruben:
As a matter of fact, I am working with my reactors since 2006, smaller or bigger as they might be, and I make clinic check ups every 6 months.
This year I made more of them, because of the inguinal hernia surgery I had to make. My health is perfect.
Also the members of my Team make regular visits and they too never had problems.
Warm Regards,
A.R.
Caro Andrea
making jogging around the 1MW Ecat for all this time you surely have digged a channel around the plant, like the Middle Age castles!
And many congratulations for your historic US Patent.
Ugo
Nils Fryklund:
It was unknown of, but now we have understood and fixed it.
Thank you for your care: yes, I eat good food and I swim and bike every day at least one hour. When I have not time for that, I make jogging around the plant: better than nothing.
Warm Regards,
A.R.
Dr Rossi:
Again congratulations for your US Patent.
May I ask you if you make periodic medical visits, to check your health after staying per so many monthd working 16 hours per day inside a plant like that?
Cheers,
Ruben
The problems you have been experiencing on the 1MW eCat system — are the primarily associated with a specific 250kW reactor subunit? Or are the problems spread over multiple 250kW reactors? In engineering, a continuing defective component is known as a “weak sister”.
Dr Andrea Rossi,
is the problem with the 1 MW E-Cat depending on normal failures, like heat cracks, datarecording etc or on unknown issues?
P.S. You work so much, don’t forget to eat good food and make exercise!
Regards,
Nils Fryklund
Marco Serra:
Of course I am worried. As I am saying repeatedly, the final results of the tests on course could be either positive or negative. Every day is an anxious day here. Also today. Thank you for your sympathy.
Warm Regards,
A.R.
Saturday, Nov 07, 08 a.m.
E-Cat 1 MW : almost repaired
E-Cat X: promising, still in operation, difficult to control, but very promising.
Warm Regards,
A.R.
Dear Andrea,
I’m a bit worried about your “E-Cat 1 MW some problems” yesterday statement.
Will the final ECat you are planning to sell be potentially vulnerable to the same kind of problems you are experimenting now ?
If yes, could the persistence of them delay your the start of the mass production phase ?
Aren’t you worried about that ?
Dear Dr. Rossi, in these slides they talk about the construction of LENR plants in China.
There has been a signing ceremony of the Baishishan International Innovation Park of China-US Science and Technology that took place in Beijing on October 18, 2015.
It seems that they are assuming that the test of your plant will be surely positive.
Dr Andrea Rossi:
Strong congratulations for your US Patent and for the extension of it to all the world.
Day by day your figure discloses itself, like an iceberg that slowly emerges.
Cheers,
Lorna
Dear Andrea,
How is your health, after all this long period ( 9 months now) working night and day in the plant?
Take care of yourself, you are a patrimony for all of us,
Lilly
Hurley:
The certifications will be given to our Customers and our experts of the matter are doing the due and specific certifications necessary to the purpose.
Warm Regards,
A.R.
What type of certification will you get. (North American Standard: UL or NRTL, ANSI, FCC, and CSA-Canada. Note; CE-mark is a European self-certification requirement and is not comparable with the NRTL listing as required by OSHA and the local jurisdictions (AHJ). The CE-mark does not comply with the National Electric Code (NEC.
I had to replace a newly installed gas monitor in CA at the refinery because it was not UL but CE.
Thank you
Hurley
Joseph,
Thank you, but if the results will be positive, this will be due also to the work of our Team and also of the great family of this blog, from which so much I have learnt and of Prof Sergio Focardi and Prof Norman Cook, whose book has put the theoretical bases to the evolution of my work during these last 6 years. If the results will be negative, obviously, the responsibility will be totally mine, because I am the one that has taken all the decisions on the battlefield.
Warm Regards,
A.R.
Curiosone:
The plans to produce 1 million modules per year are done completely and ready. Also the manufacturing place has already been selected. Obviously all depends on the results of the tests on course and on the certification process. There are many factors that forbid for now to foresee the timeframe.
Warm Regards,
A.R.
Hugh De Vries:
Measuring the heat produced will be same as for any other kind of generator; the cost of it will be made by the cost of the fuel. Obviously, as well as for any other kind of plants, the cost will also have to be combined with the amortization and maintainance costs.
Warm Regards,
A.R.
Mr Rossi,
Are you working also today, Sunday? How is going the plant?
Aji
Ruben:
As a matter of fact, I am working with my reactors since 2006, smaller or bigger as they might be, and I make clinic check ups every 6 months.
This year I made more of them, because of the inguinal hernia surgery I had to make. My health is perfect.
Also the members of my Team make regular visits and they too never had problems.
Warm Regards,
A.R.
Caro Andrea
making jogging around the 1MW Ecat for all this time you surely have digged a channel around the plant, like the Middle Age castles!
And many congratulations for your historic US Patent.
Ugo
Dr Andrea Rossi
If you will commercialize the E-Cat in Europe will be directly by Leonardo or through agencies?
Al
Nils Fryklund:
It was unknown of, but now we have understood and fixed it.
Thank you for your care: yes, I eat good food and I swim and bike every day at least one hour. When I have not time for that, I make jogging around the plant: better than nothing.
Warm Regards,
A.R.
Dr Andrea Rossi:
Do you think your E-Cat X will be commercialized also in Italy?
Cordiali saluti,
Ivo
Dr Rossi:
Again congratulations for your US Patent.
May I ask you if you make periodic medical visits, to check your health after staying per so many monthd working 16 hours per day inside a plant like that?
Cheers,
Ruben
Steven N. Karels:
The problems are “spread”.
Warm Regards,
A.R.
Dear Andrea Rossi,
The problems you have been experiencing on the 1MW eCat system — are the primarily associated with a specific 250kW reactor subunit? Or are the problems spread over multiple 250kW reactors? In engineering, a continuing defective component is known as a “weak sister”.
Dr Andrea Rossi,
is the problem with the 1 MW E-Cat depending on normal failures, like heat cracks, datarecording etc or on unknown issues?
P.S. You work so much, don’t forget to eat good food and make exercise!
Regards,
Nils Fryklund
Frank Acland:
Partially yes.
Warm Regards,
A.R.
Paul Calvo:
Thank you for the interesting link.
Warm Regards,
A.R.
Utilities are Running Out Of Time To Adapt To Energy Revolution.
http://www.forbes.com/sites/jeffmcmahon/2015/10/18/utilities-run-out-of-time-to-adapt-to-energy-revolution/?utm_source=Sailthru&utm_medium=email&utm_campaign=Daily%20Digest%20Send%202015-10-18&utm_term=Daily-Digest
Dear Andrea,
During this current repair, have you had to take the plant offline?
Kind regards,
Frank Acland
Marco Serra:
Of course I am worried. As I am saying repeatedly, the final results of the tests on course could be either positive or negative. Every day is an anxious day here. Also today. Thank you for your sympathy.
Warm Regards,
A.R.
Italo R.:
I am focused on my plant and nothing is sure, so far. Negative results are still possible.
Warm Regards,
A.R.
Saturday, Nov 07, 08 a.m.
E-Cat 1 MW : almost repaired
E-Cat X: promising, still in operation, difficult to control, but very promising.
Warm Regards,
A.R.
Lilly:
Thank you for your care: thanks God I am very well.
Warm Regards,
A.R.
Lorna:
We are a great team. This is true.
Warm Regards,
A.R.
Dear Andrea,
I’m a bit worried about your “E-Cat 1 MW some problems” yesterday statement.
Will the final ECat you are planning to sell be potentially vulnerable to the same kind of problems you are experimenting now ?
If yes, could the persistence of them delay your the start of the mass production phase ?
Aren’t you worried about that ?
God bless you
Marco Serra
Dear Dr. Rossi, in these slides they talk about the construction of LENR plants in China.
There has been a signing ceremony of the Baishishan International Innovation Park of China-US Science and Technology that took place in Beijing on October 18, 2015.
It seems that they are assuming that the test of your plant will be surely positive.
http://chinauspark.com/appUpdata/file/20140925/20140925152226_9375.pdf
Kind Regards,
Italo R.
Jimmy:
Obviously, yes.
Warm Regards,
A.R.
Dr Andrea Rossi:
Strong congratulations for your US Patent and for the extension of it to all the world.
Day by day your figure discloses itself, like an iceberg that slowly emerges.
Cheers,
Lorna
Dear Andrea,
How is your health, after all this long period ( 9 months now) working night and day in the plant?
Take care of yourself, you are a patrimony for all of us,
Lilly
Mr Andrea Rossi
Will you give us an update for today?
Frank Acland:
Yes
Warm Regards
A.R.
Dear Andrea,
Do you still expect that your 1MW plant test will be completed in February 2016?
Many thanks,
Frank Acland
Robert Curto:
Interesting information: thank you for the link.
Warm Regards,
A.R.
Maryana:
Nov 6, 11.55 a.m.
E-Cat 1 MW some problems
E-Cat X: working with instability
Warm Regards,
A.R.
Dr. Rossi, if you and your Readers are interested in the latest information on
Batteries.
Google:
nov.5 edition of nature scientific reports
Scroll down and click on:
Using hydrogen to enhance lithium ion batteries
Robert Curto
Ft. Lauderdale, Florida
Bernie F.:
Yes, soon on my personal website.
Warm Regards,
A.R.
Adrianne:
Thank you, we are just making our work.
Warm Regards,
A.R.
Hurley:
The certifications will be given to our Customers and our experts of the matter are doing the due and specific certifications necessary to the purpose.
Warm Regards,
A.R.
YTCameron:
Lower.
F9.
Warm Regards,
A.R.
Dr Rossi:
Is your relationship with IH stil good?
JR
Mr. Rossi,
What type of certification will you get. (North American Standard: UL or NRTL, ANSI, FCC, and CSA-Canada. Note; CE-mark is a European self-certification requirement and is not comparable with the NRTL listing as required by OSHA and the local jurisdictions (AHJ). The CE-mark does not comply with the National Electric Code (NEC.
I had to replace a newly installed gas monitor in CA at the refinery because it was not UL but CE.
Thank you
Hurley
Tanie Przeprowadzki:
Yes.
Warm Regards,
A.R.
WernerPlunk, where is the Brillouin – MIT connection described?
Dr Andrea Rossi:
Congratulations for your US Patent and its extension in the whole word: this is History!
Godspeed,
Adrianne
Mr Rossi:
Can we see a drawing of the new 1MW E-Cat you foresee to sell, after all the tests made so far?
Thanks,
Bernie
Dr Andrea Rossi
Will the cost per kW of power be the same of traditional systems or more, due to higher efficiency?
Cheers,
Y
Dear Andrea:
How is going everything today in the plant?
Joseph,
Thank you, but if the results will be positive, this will be due also to the work of our Team and also of the great family of this blog, from which so much I have learnt and of Prof Sergio Focardi and Prof Norman Cook, whose book has put the theoretical bases to the evolution of my work during these last 6 years. If the results will be negative, obviously, the responsibility will be totally mine, because I am the one that has taken all the decisions on the battlefield.
Warm Regards,
A.R.
Curiosone:
The plans to produce 1 million modules per year are done completely and ready. Also the manufacturing place has already been selected. Obviously all depends on the results of the tests on course and on the certification process. There are many factors that forbid for now to foresee the timeframe.
Warm Regards,
A.R.
Werner Plunk:
1- I never comment the work of our competitors
2- I am not a ghostbuster
Warm Regards,
A.R.
Gioia:
November 05, 11.20 p.m.
E-Cat 1 MW repaired , E-Cat X operative and promising.
Warm Regards,
A.R.
D. Travchenko:
I think a couple of months.
Warm Regards,
A.R.
Hugh De Vries:
Measuring the heat produced will be same as for any other kind of generator; the cost of it will be made by the cost of the fuel. Obviously, as well as for any other kind of plants, the cost will also have to be combined with the amortization and maintainance costs.
Warm Regards,
A.R.
Dear Dr Andrea Rossi:
Are you making applications to extend your US Patent in all the world?
Thanks,
Tanie
Ing Carlo Tonolli:
I am sorry, patents are in preparation for them.
I cannot make pre-publication.
Warm Regards,
A.R.