Dear Andrea!
Do you think that the industrial certificate will be valid for steam-locomotive?
In that case, would E-cat suddenly eco-modernize all old steam-locomotives in the world.
Best regards
Nils Fryklund
Dear Andrea,
How many e cat quarks will you assemble in your first industrial prototype to test the controller, design of heat exchanger, reliability?
i wish you the best
Have you determined a location for your US robotic manufacturing facility? I.E. (City and State) Elon Musk was able to obtain significant financial advantage by the location of his battery manufacturing plant in Nevada. I would suppose that you could do the same by site selection. I’m not a fan of corporate welfare, but why not use all legal means available to determine an optimal location for this manufacturing enterprise to provide maximum financial returns to Leonardo. I’m sure President Trump will welcome your domestic manufacturing facility to provide more jobs to make America great again.
Dear Andrea,
You mentioned using a design like the 1 MW artist’s model on the http://www.ecat.com website– At the 10,000 foot level, I like the model. However, at the detailed level, it seems as if there are too many flexible pipes and connectors– each one of which could be a potential source of failure and a headache to repair.
For an industrial environment, robotic manufacturability, high pressure & temperature, long lifetimes, long MTBF (“Meantime Between Failures”) and short “Time to Repair”, I would expect to see something like the engine of a car (or a truck)– lots of metal, manifolds, and bolt-on interconnections– especially in the path of the steam/hot water.
Tell me: I’m reading too much into the fine details of the artist’s rendition, aren’t I?
Tom Conover:
We are not bound on a specific “core power” for the certification, we have to certify a module and its assembly systems.
I hope we will have our first sprout from the robots within 2018 year ( attention: NOT 2018 years !!! )
Thank you for your permanent attention to our work,
Warm Regards,
A.R.
Your industrial certification requires a “core” model that produces 10kw, is that still your requirement for the basic module of the Quark? (using an assembly of course.)
(and one more please)
When do you hope to have your first prototype from the robots to duty test, 6 months, 3 months, 1 month, sooner?
Thank you for your open communication channel on JONP.
Frank Acland:
1- yes
2- USA and Sweden
3- yes
4- USA and Sweden
5- The launch will be made when the product will be ready to buy and use
6- it depends on the kind of applications
7- yes
8- I dream of it and it is not impossible, albeit it will be very hard. But I am optimistic ( actually I always am and many times I am wrong ) after the developments we made from the Stockholm event up to now: I can assure you we have not spent this timeframe combing the puppets of my friend Thomas Florek.
Warm Regards,
A.R.
Dear Dr Andrea Rossi:
The industrial Ecat of 1 MW will have the design similar to the artistic model we can see in the http://www.ecat.com website?
All the best,
Maggie
I’m trying to get a clearer understanding of your plans for the commercialization E-Cat.
1. Will the presentation of the first E-Cat QX product be made at the time you announce the launch of the E-Cat QX?
2. Where will the presentation take place?
3. Will the presentation take place after the planned robotized lines have started operating?
4. Where will the first robotized lines be operating?
5. Once you announce the launch and make the presentation, will industrial products be available immediately to buy and use, or will customers have to pre-order them and wait for them to be built?
6. Will the robotized lines be making only the insides of the plants (i.e. E-Cats and controllers), or fully functioning completed plants ready to use?
7. Do you plan for expansion of manufacturing following the product presentation?
8. Do you think it is realistic to expect for this to all begin in 2018?
Dacia:
Yes, but after the presentation of the product after it will be massively manufactured. Now our focus is exclusively on the industrialization.
Warm Regards,
A.R.
German Guy:
I spam only the comments sent by the trolls. Luckily they are very few, for sure less that the 0.2% of the comments we publish. This blog has published more than forty thousand comments, the trollades have been several tens. When I say trolls, I mean persons that ignore what we say and do and continue to repeat the same stupidities, sometime disguised as friends with false appreciation or sustain. Kind of false violin players. We simply ignore them and, obviously, spam their comments, as well as their emails.
Warm Regards,
A.R.
As regards your desire to have a commercial home unit available in 2019 after the necessary certification, will there be a need to field test pre-production models prior to receiving certification?
Will different locals be required such as desert, tropical, and winter zones? Do you anticipate needing volunteers to provide testing locations and monitoring the certification test results?
The number of different industrial applications for your reactor is vast. I would suggest you can’t hope to meet world demand even with 1000 automated factories. So even if you have a cost advantage by being first to market by a few years many customers will happily pay for more expensive third party copies because you won’t be able to meet demand. Sorry but I think you are taking the wrong approach.
Anonymous:
Yes, we start from the fact, coherent with the Standard Model, that when in a field is reached a temperature equal to the mass of an elementary particle of that field, waves are formed corresponding to those particles. The fact that such particles are not observable can be explained with the fact that these particles are virtual, just resonances, probably with a lifespan around 10^-23s.
Warm Regards,
A.R.
Dawn:
No, this sector of R&D is very “green”. We have been able to measure electricity produced by the Ecat QX, but we are very far from being able to make it in continuous, efficient and utilizable way.
Warm Regards,
A.R.
Dear Andrea Rossi:
Do you think that at the beginning of the massive industrialization the Ecat will be able to produce direct electricity?
Congratulations for the Stockholm demo,
Dawn
Dear Andrea,
Congratulations for the updated website http://www.ecat.com
I can’t wait to read on it that the industrialization of the Ecat has been kicked off.
Congratulations also for the solid demo of Stockholm.
Cheers
Charlotte
Dear Dr Andrea Rossi,
When the Ecat production will be industrialized, the production will have to be immediately distributed: are you already organizing a distribution and sales circuit?
All the best,
Richard
Frank Acland:
We made strong progress. I cannot give the details, for obvious reasons, but I still can hope to start the industrialization of the industrial plants within the 2018.
Warm Regards,
A.R.
Joseph:
It will take time. Probably our idea is wrong, but we will try all to find it out, positive or negative as the results of the experiment might be. The theory we are trying to give evidence of is very audacious.
Warm Regards,
A.R.
CC,
Thank you,
Warm Regards,
A.R.
Nils Fryklund:
I am not able to answer, but the idea is brilliant in theory.
Warm Regards,
A.R.
Dear Andrea!
Do you think that the industrial certificate will be valid for steam-locomotive?
In that case, would E-cat suddenly eco-modernize all old steam-locomotives in the world.
Best regards
Nils Fryklund
Dr Andrea Rossi,
Congratulations for the very convincing demo of Stockholm,
CC
Thomas Florek:
Ha,ha,ha!
Warm Regards,
A.R.
WaltC:
Thank you for your insight and suggestion. You are not reading too much and I appreciate your goodwill to help.
Warm Regards,
A.R.
Drew G.:
I agree.
Warm Regards,
A.R.
Domenico Canino:
1 MW of power.
Warm Regards,
A.R.
Dear Dr Andrea Rossi,
Do you confirm that your robots will be made by ABB?
Dear Andrea,
How many e cat quarks will you assemble in your first industrial prototype to test the controller, design of heat exchanger, reliability?
i wish you the best
Dr. Rossi:
Have you determined a location for your US robotic manufacturing facility? I.E. (City and State) Elon Musk was able to obtain significant financial advantage by the location of his battery manufacturing plant in Nevada. I would suppose that you could do the same by site selection. I’m not a fan of corporate welfare, but why not use all legal means available to determine an optimal location for this manufacturing enterprise to provide maximum financial returns to Leonardo. I’m sure President Trump will welcome your domestic manufacturing facility to provide more jobs to make America great again.
Dear Andrea,
You mentioned using a design like the 1 MW artist’s model on the http://www.ecat.com website– At the 10,000 foot level, I like the model. However, at the detailed level, it seems as if there are too many flexible pipes and connectors– each one of which could be a potential source of failure and a headache to repair.
For an industrial environment, robotic manufacturability, high pressure & temperature, long lifetimes, long MTBF (“Meantime Between Failures”) and short “Time to Repair”, I would expect to see something like the engine of a car (or a truck)– lots of metal, manifolds, and bolt-on interconnections– especially in the path of the steam/hot water.
Tell me: I’m reading too much into the fine details of the artist’s rendition, aren’t I?
> I can assure you we have not spent this timeframe combing the puppets of my friend Thomas Florek.
That explains why the Andrea Rossi puppet went out to church this morning with messy hair. 🙂
Dear Readers:
Please find on
http://www.rossilivecat.com
some comments published today on other posts of this blog.
Warm Regards,
A.R.
Michelangelo De Meo:
He he he… I hope too.
Congratulations!
Warm Regards
A.R.
hello dr. Rossi, if you want to relax a bit with this fantastic story of a shipwreck that really happened on January 7th 1825.
http://www.ilmattinodifoggia.it/news/almanacco-dauno/35050/oggi-7-gennaio-1825-il-naufragio-di-stefano-alle-isole-tremiti-un-brigantino-austriaco-da-210-tonnellate.html
I hope we will not have to wait 100 years more to find an Ecat for sale on a sinked ship!
Tom Conover:
We are not bound on a specific “core power” for the certification, we have to certify a module and its assembly systems.
I hope we will have our first sprout from the robots within 2018 year ( attention: NOT 2018 years !!! )
Thank you for your permanent attention to our work,
Warm Regards,
A.R.
Good morning Andrea,
I peeked at your website again this morning, and I like one of the models shown a little more than the others, this is the image I liked best:
https://113452-323143-raikfcquaxqncofqfm.stackpathdns.com/wp-content/uploads/2015/07/Heating-System-e1512736404253.jpg
Quick question for you.
Your industrial certification requires a “core” model that produces 10kw, is that still your requirement for the basic module of the Quark? (using an assembly of course.)
(and one more please)
When do you hope to have your first prototype from the robots to duty test, 6 months, 3 months, 1 month, sooner?
Thank you for your open communication channel on JONP.
Keep up the great work!
Tom
Frank Acland:
1- yes
2- USA and Sweden
3- yes
4- USA and Sweden
5- The launch will be made when the product will be ready to buy and use
6- it depends on the kind of applications
7- yes
8- I dream of it and it is not impossible, albeit it will be very hard. But I am optimistic ( actually I always am and many times I am wrong ) after the developments we made from the Stockholm event up to now: I can assure you we have not spent this timeframe combing the puppets of my friend Thomas Florek.
Warm Regards,
A.R.
Maggie:
I like that model. Do you?
Warm Regards,
A.R.
Dear Dr Andrea Rossi:
The industrial Ecat of 1 MW will have the design similar to the artistic model we can see in the http://www.ecat.com website?
All the best,
Maggie
Dear Andrea,
I’m trying to get a clearer understanding of your plans for the commercialization E-Cat.
1. Will the presentation of the first E-Cat QX product be made at the time you announce the launch of the E-Cat QX?
2. Where will the presentation take place?
3. Will the presentation take place after the planned robotized lines have started operating?
4. Where will the first robotized lines be operating?
5. Once you announce the launch and make the presentation, will industrial products be available immediately to buy and use, or will customers have to pre-order them and wait for them to be built?
6. Will the robotized lines be making only the insides of the plants (i.e. E-Cats and controllers), or fully functioning completed plants ready to use?
7. Do you plan for expansion of manufacturing following the product presentation?
8. Do you think it is realistic to expect for this to all begin in 2018?
Thank you for your responses,
Frank Acland
Dear Readers:
Please find on
http://www.rossilivecat.com
the comments published on other posts of this blog.
Warm Regards,
A.R.
Dacia:
Yes, but after the presentation of the product after it will be massively manufactured. Now our focus is exclusively on the industrialization.
Warm Regards,
A.R.
C
I suppose so, but we have to find evidence of it, yet.
Warm Regards,
A.R.
Valery:
Yes.
Warm Regards,
A.R.
Dr Andrea Rossi,
Congratulations for the convincing test of Stockolm.
Have you thought to sell the Ecats also by internet?
Cheers
Valery
Dear Andrea Rossi,
Do you think that the waves raised by the temperature equal to the mass of the same virtual waves could be waves and antiwaves?
Dear Andrea,
Are you open to make more demonstrations?
Dacia
German Guy:
I spam only the comments sent by the trolls. Luckily they are very few, for sure less that the 0.2% of the comments we publish. This blog has published more than forty thousand comments, the trollades have been several tens. When I say trolls, I mean persons that ignore what we say and do and continue to repeat the same stupidities, sometime disguised as friends with false appreciation or sustain. Kind of false violin players. We simply ignore them and, obviously, spam their comments, as well as their emails.
Warm Regards,
A.R.
Luis Navarro:
Felicitades tambien a ti,
A.R.
LOS REYES MAGOS
🤴🏻🤴🏻🤴🏿
🐪🐪🐪
Felicidades a todos!
Luis
Dr Rossi,
Do you publish all the comments you receive here in the blog of the JoNP, or do you spam any of them?
Colin Watters:
It depends on how our approach will be realized. Thank you for your insight, though.
Warm Regards,
A.R.
Daniel G.Zavela:
None of those issues is mandatory, all of them are a good idea.
Warm Regards,
A.R.
Dear Dr. Rossi,
As regards your desire to have a commercial home unit available in 2019 after the necessary certification, will there be a need to field test pre-production models prior to receiving certification?
Will different locals be required such as desert, tropical, and winter zones? Do you anticipate needing volunteers to provide testing locations and monitoring the certification test results?
Best of luck with industrialization in 2018.
Best Regards,
Daniel G. Zavela
Dear Mr Rossi,
The number of different industrial applications for your reactor is vast. I would suggest you can’t hope to meet world demand even with 1000 automated factories. So even if you have a cost advantage by being first to market by a few years many customers will happily pay for more expensive third party copies because you won’t be able to meet demand. Sorry but I think you are taking the wrong approach.
Anonymous:
Yes, we start from the fact, coherent with the Standard Model, that when in a field is reached a temperature equal to the mass of an elementary particle of that field, waves are formed corresponding to those particles. The fact that such particles are not observable can be explained with the fact that these particles are virtual, just resonances, probably with a lifespan around 10^-23s.
Warm Regards,
A.R.
Dawn:
No, this sector of R&D is very “green”. We have been able to measure electricity produced by the Ecat QX, but we are very far from being able to make it in continuous, efficient and utilizable way.
Warm Regards,
A.R.
Dear Andrea Rossi:
Do you think that at the beginning of the massive industrialization the Ecat will be able to produce direct electricity?
Congratulations for the Stockholm demo,
Dawn
Dr Andrea Rossi
You say the theory you are working on is audacious and could be wrong. Is it coherent with the Standard Model?
Richard:
Yes, we are studying the assistance and the sales system.
Warm Regards,
A.R.
Charlotte:
Thank you, me too!
Warm Regards,
A.R.
Niclas:
Yes, it is one of our targets.
Warm Regards,
A.R.
Dr Andrea Rossi,
will the experiment you will make with Gullstrom indagate also the possibility to produce direct electricity?
Dear Andrea,
Congratulations for the updated website http://www.ecat.com
I can’t wait to read on it that the industrialization of the Ecat has been kicked off.
Congratulations also for the solid demo of Stockholm.
Cheers
Charlotte
Dear Dr Andrea Rossi,
When the Ecat production will be industrialized, the production will have to be immediately distributed: are you already organizing a distribution and sales circuit?
All the best,
Richard
Frank Acland:
We made strong progress. I cannot give the details, for obvious reasons, but I still can hope to start the industrialization of the industrial plants within the 2018.
Warm Regards,
A.R.
Joseph:
It will take time. Probably our idea is wrong, but we will try all to find it out, positive or negative as the results of the experiment might be. The theory we are trying to give evidence of is very audacious.
Warm Regards,
A.R.
Dear Dr Andrea Rossi:
When will be able to read the results of the theoretical experiments you are making with Gullstrom?
Cheers
Joseph