The lobbyist is a very powerful group of persons in Washington. Usually they try derail or delay changes. Like: making it harder for microbreweries to get authorizations to produce, etc.
Basically they rather invest in lawyers instead of improving their products and services.
The better part of the fossil energy industry have been based their future on shell oil and they may not be fit to adopt to the new market situation.
Do you expect the fossil industry to try to stop or delay the clean energy (LENR)??
You have previously made notes about the needs to be a business for everybody for LENR to survive.
Congratulations on completion of the 1-year 1 MW E-Cat test program.
I am hopeful that (F9) will be positive.
Do you think that analysis of the 1 MW test results will support the theoretical basis of how both the E-Cat and the E-Cat X systems operate?
Or, since the E-Cat and E-Cat X systems are significantly different, do you think or expect there are additional or different physics operating in the E-Cat X?
If you feel confident enough in the the E-Cat X that it is moving towards mass production, would it be possible now to disclose the following information?
1. What size/power will the units be that you are planning to manufacture?
2. Is there a target price?
3. What is the expected direct electrical production of the units?
Thank you for taking the time to answer my question.
Will the X-cat be scalable to the Mw range, I will be looking at combining X-cats with Graphene super capacitors so as to increase the peak output of the ecats (see Dr Robert Murrays-Smith work) https://www.youtube.com/channel/UC4AkVj-qnJxNtKuz3rkq16A. Now everything is starting to get exciting and would love to be part of it.
Pietro F.:
Yes, the new factory of Leonardo Corporation in which the E-Cat X will be manufactured is in Florida. I must repeat F9, but I can add that in these very days we are making exponential progress. We are very close to be ready to make 1 million pcs/year, technologically speaking. From the moment I will decide that we are ready to start to the moment in which we will start the production line, it will take not more than 3 months. All is already organized. Now that I can give to this concern my full time, we are advancing very fast.
Warm Regards,
A.R.
P.S.: Your comment is the number 28 000 of this blog. Thank you!
Malcom Beverly:
Industrial Heat has been licensed also for all Americas.
Here is the address you must contact for the E.Cat’s industrial and commercial issues related to Brasil: info@industrialheat.co
Warm Regards,
A.R.
Eernie1:
No, we are not collecting pre-orders, because all the pre-orders we got from the E-Cat will be automatically turned to the E-Cat X.
This is why we are programming a production of 1 million pieces in the first year of manufacturing. F9.
Warm Regards,
A.R.
Dear Andrea,
Are you taking pre- orders for the E-Catx like you did for the low temp E-Cat? This should give you an idea of how large a production would be necessary at first, and how large a support group would be required. At least for the near term period when production would start,your planners could be guided by these numbers.
Scheduling regards.
Mr Andrea Rossi:
We are interested to buy a license for Brasil.
Can we contact Leonardo Corporation for this? If yes, can you give us a contact?
Regards,
Complimenti Andrea per la sua caperbietà, merita tutto il successo che ha e avrà.
Il test sull’Ecatx potrebbe essere F9?
Una curiosità, il laboratorio/fabbrica dell’Ecatx é in Florida?
Congratulations Andrea for his stubbornness, deserves all the success he has and will have.
The Ecatx test could be F9?
A curiosity, the Ecatx laboratory/factory is in Florida?
Dear Andrea:
In the last post of the blog in http://www.ecat-thenewfire.com there is a photo of you flying in a private jet: do you use a private jet for your business travels?
Flying regards,
Jay Jay
Dr. Rossi:
Congratulations on your latest achievement of successfully operating a 1 MW E-Cat in an industrial plant(F9). We all look forward toward your next milestone and achievement.
Best Regards,
Bill Hayes
Congratulations on completing the 1MW year long test. I know you are waiting on the results (F9) but still your efforts are commendable and inspiring even if you don’t want to acknowledge it until positive results are achieved. Well done!
My question is now that the 1MW low temperature plant test is over, will you be overseeing the upgrades to the low temperature 1MW plant you spoke about?
Thanks and I look forward to seeing the E-Cat on the market soon (F9).
Facility in Sweden – Once again innovation friendly and open society Sweden takes the price! Will this facility be prepared in collaboration with the northern European licensee, Hydrofusion?
If the test is positive, Andrea, you can afford a glas, or two, of Petrus 71.
Gerard McEk:
He,he…Thank you; yes, the E-Cat X now is the real focus. I want to realize the dream of New Year’s Eve midnight. I am thinking to what Tesla made in Chicago: how great!
Warm Regards,
A.R.
Italo R.:
Thank you. Waiting for the Report with the results, my focus is totally on the E-Cat X; next week will be a very important week for the E-Cat X, because we will make a very important test in a new factory.
Warm Regards,
A.R.
Robert Curto:
Thank you for your sympathy. I have to continue the work the hard way: I do not have the chances God has…al I got is the will to work to obtain what I want ( hoping in His help too).
Warm Regards,
A.R.
Bernie Koppenhofer:
I cannot give information related to the 1MW E-Cat used for the test until the Report with the results will be delivered.
Warm Regards,
A.R.
Dear Andrea,
Congratulations with the finalization of the 1MW test.
No more night shifts, possibly less stress as nothing can be done anymore to change the final judgement of which we all hope will be positive.
I hope your normal life now reestablishes and you can devote all your time on your hobbies, (which I assume is the E-cat X for a huge part).
Stay healthy!
Kind regards, Gerard
Dear Andrea Rossi:
Congratulations: now, with a US Patent granted and a 1 year test made (F9, I know) Leonardo Corporation is going to be a serious thing.
You merit it for your perseverance and courage.
In bocca al lupo!
Gavino
I am glad to read you are able to rest and enjoy life more, and concentrate on the E-Cat X.
Is there any plan for the timing of sharing the results of the test? Some suggest that March 23 (Pons and Fleischmann announcement anniversary) might be selected. What do you think of that guess?
Dr. Rossi: I do not understand, why refuel the reactor without knowing f9? (: Really glad to hear you are relaxing just a bit, please not too much, we expect more great things from you!
Dr. Rossi, I was very happy to hear of your new Schedule.
However, I would like to suggest some slight improvements.
Make it 8A to 8P. That is one half of one day.
Take Sunday off.
The World has waited 3,000 Years for your Invention.
I don’t think waiting a few extra weeks is asking too much !
And remember God rested on the seventh day.
I don’t think you can go wrong, following in His footsteps.
Robert Curto
Dear Dr. Rossi, now that the 350-day test is over and you have changed the fuel, I think it is logical to think that the system will continue to function without you, but with the assistance of your first clever Team. If so, the Customer will continue to be happy. Yes I know, you cannot (yet) tell us if your Customer has been happy…
Anyway, we all are happy for and with you.
Dear Andrea, I think now we can call us by name, congratulations for the end of the test of E-CAT 1 MW, F9 if you want, but I have no doubt. Now I have a question: what is the minimum power of the industrial E-Cat that can be bought today ? I think this information will be very useful for many of us .
Dr. Rossi, I would like to suggest your Readers Google:
animpossibleinvention.com
On the website you can also subscribe to their interesting Newsletter.
The Book, An Impossible Invention is now available in Italian.
Robert Curto
Ft. Lauderdale Florida
USA
Winny Depp:
Wake up at 6, go to the Leonardo Corp laboratory to eork on the E-Cat X, at 1 p.m. lunch, then from 2 to 7 p.m. E-Cat X, Physics study, then 1 hour of exercise, then free.
How beautiful sleep during the night!
Warm Regards,
A.R.
Dear Mr Rossi,
The lobbyist is a very powerful group of persons in Washington. Usually they try derail or delay changes. Like: making it harder for microbreweries to get authorizations to produce, etc.
Basically they rather invest in lawyers instead of improving their products and services.
The better part of the fossil energy industry have been based their future on shell oil and they may not be fit to adopt to the new market situation.
Do you expect the fossil industry to try to stop or delay the clean energy (LENR)??
You have previously made notes about the needs to be a business for everybody for LENR to survive.
Dear Andrea Rossi,
Congratulations on completion of the 1-year 1 MW E-Cat test program.
I am hopeful that (F9) will be positive.
Do you think that analysis of the 1 MW test results will support the theoretical basis of how both the E-Cat and the E-Cat X systems operate?
Or, since the E-Cat and E-Cat X systems are significantly different, do you think or expect there are additional or different physics operating in the E-Cat X?
That is, is the E-Cat X a different kind of cat?
Curious regards,
Joseph Fine
Fyodor:
1- we still have to decide. Some more time for tests is necessary
2- yes
3- depends on the size, returning to 1.
Warm Regards,
A.R.
Jessie:
Yes, I think so and I am working strongly for this.
Warm Regards,
A.R.
Dear Andrea Rossi,
You think that we will see an E-Cat X at work at least in an industrial application within 2016 ?
Godspeed,
Jessie
Mr. Rossi
I hope that all is well with you.
If you feel confident enough in the the E-Cat X that it is moving towards mass production, would it be possible now to disclose the following information?
1. What size/power will the units be that you are planning to manufacture?
2. Is there a target price?
3. What is the expected direct electrical production of the units?
Thank you for taking the time to answer my question.
Fyodor
Manuel Cilia:
The modules of the E-Cat X will be assemblable up to any power.
F9.
Warm Regards
A.R.
Dear Dr Rossi
Will the X-cat be scalable to the Mw range, I will be looking at combining X-cats with Graphene super capacitors so as to increase the peak output of the ecats (see Dr Robert Murrays-Smith work) https://www.youtube.com/channel/UC4AkVj-qnJxNtKuz3rkq16A. Now everything is starting to get exciting and would love to be part of it.
Pietro F.:
Yes, the new factory of Leonardo Corporation in which the E-Cat X will be manufactured is in Florida. I must repeat F9, but I can add that in these very days we are making exponential progress. We are very close to be ready to make 1 million pcs/year, technologically speaking. From the moment I will decide that we are ready to start to the moment in which we will start the production line, it will take not more than 3 months. All is already organized. Now that I can give to this concern my full time, we are advancing very fast.
Warm Regards,
A.R.
P.S.: Your comment is the number 28 000 of this blog. Thank you!
N. Armstrong:
Thank you for the link,
Warm Regards,
A.R.
Malcom Beverly:
Industrial Heat has been licensed also for all Americas.
Here is the address you must contact for the E.Cat’s industrial and commercial issues related to Brasil:
info@industrialheat.co
Warm Regards,
A.R.
Eernie1:
No, we are not collecting pre-orders, because all the pre-orders we got from the E-Cat will be automatically turned to the E-Cat X.
This is why we are programming a production of 1 million pieces in the first year of manufacturing. F9.
Warm Regards,
A.R.
Dear Andrea,
Are you taking pre- orders for the E-Catx like you did for the low temp E-Cat? This should give you an idea of how large a production would be necessary at first, and how large a support group would be required. At least for the near term period when production would start,your planners could be guided by these numbers.
Scheduling regards.
Mr Andrea Rossi:
We are interested to buy a license for Brasil.
Can we contact Leonardo Corporation for this? If yes, can you give us a contact?
Regards,
Article has 5 big Wins in clean energy > Cold Fusion / LENR will be next.
http://tinyurl.com/zdhelr7
Complimenti Andrea per la sua caperbietà, merita tutto il successo che ha e avrà.
Il test sull’Ecatx potrebbe essere F9?
Una curiosità, il laboratorio/fabbrica dell’Ecatx é in Florida?
Congratulations Andrea for his stubbornness, deserves all the success he has and will have.
The Ecatx test could be F9?
A curiosity, the Ecatx laboratory/factory is in Florida?
Ancora auguri.
Pietro F.
Jay:
If I have to.
Warm Regards,
A.R.
Brice Minton:
The date of delivery of the Report of the third entity does not depend on me.
Thank you for your kind words.
Warm Regards,
A.R.
We still find it incredibly fascinating that your E-CAT X Reactor is just the size of a standard pencil
and consistently puts out temperatures over 1000 degrees and is able to generate electricity.
The Fleishman and Pons news conference was held on March 23, it would be wonderful and appropriate
to make an announcement around this date confirming excess heat and possible paradigm shift in energy.
Exciting Times,
Brice Minton
Dear Andrea:
In the last post of the blog in http://www.ecat-thenewfire.com there is a photo of you flying in a private jet: do you use a private jet for your business travels?
Flying regards,
Jay Jay
Frank Acland:
Yes
Warm Regards
A.R.
Doug:
Yes, we are working in collaboration with Hydrofusion in Sweden.
Warm Regards
A.R.
Peter Metz:
Thank you for your kind words.
Yes, I will direct in Leonardo Corporation the development of the E-Cat X.
Warm Regards
A.R.
Bill Hayes:
Thank you. F9.
Warm Regards,
A.R.
Dr. Rossi:
Congratulations on your latest achievement of successfully operating a 1 MW E-Cat in an industrial plant(F9). We all look forward toward your next milestone and achievement.
Best Regards,
Bill Hayes
Dear Andrea Rossi,
Congratulations on completing the 1MW year long test. I know you are waiting on the results (F9) but still your efforts are commendable and inspiring even if you don’t want to acknowledge it until positive results are achieved. Well done!
My question is now that the 1MW low temperature plant test is over, will you be overseeing the upgrades to the low temperature 1MW plant you spoke about?
Thanks and I look forward to seeing the E-Cat on the market soon (F9).
Sincerely,
Peter Metz
Dear Andrea,
Facility in Sweden – Once again innovation friendly and open society Sweden takes the price! Will this facility be prepared in collaboration with the northern European licensee, Hydrofusion?
If the test is positive, Andrea, you can afford a glas, or two, of Petrus 71.
Yours Truly,
Doug
Dear Andrea,
Is the laboratory where you are doing your E-Cat X tests in the E-Cat X factory that you have mentioned?
Many thanks,
Frank Acland
Gerard McEk:
He,he…Thank you; yes, the E-Cat X now is the real focus. I want to realize the dream of New Year’s Eve midnight. I am thinking to what Tesla made in Chicago: how great!
Warm Regards,
A.R.
Gavino:
Thank you, but let’s wait for the results.
Warm Regards,
A.R.
Robert Curto:
Thank you for your information about the book of Mats Lewan.
Warm Regards,
A.R.
Dear Neri:
Thank you for your kindness. I must repeat F9.
The minimum power for industrial utilizations is 250 kW.
Warm Regards,
Andrea
Italo R.:
Thank you. Waiting for the Report with the results, my focus is totally on the E-Cat X; next week will be a very important week for the E-Cat X, because we will make a very important test in a new factory.
Warm Regards,
A.R.
Robert Curto:
Thank you for your sympathy. I have to continue the work the hard way: I do not have the chances God has…al I got is the will to work to obtain what I want ( hoping in His help too).
Warm Regards,
A.R.
Bernie Koppenhofer:
I cannot give information related to the 1MW E-Cat used for the test until the Report with the results will be delivered.
Warm Regards,
A.R.
Dear Readers:
Please go to
http://www.rossilivecat
to find comments on other posts published today.
Warm Regards,
A.R.
Frank Acland:
I cannot know when the Report of the third entity will be delivered.
Warm Regards,
A.R.
Dear Andrea,
Congratulations with the finalization of the 1MW test.
No more night shifts, possibly less stress as nothing can be done anymore to change the final judgement of which we all hope will be positive.
I hope your normal life now reestablishes and you can devote all your time on your hobbies, (which I assume is the E-cat X for a huge part).
Stay healthy!
Kind regards, Gerard
Dear Andrea Rossi:
Congratulations: now, with a US Patent granted and a 1 year test made (F9, I know) Leonardo Corporation is going to be a serious thing.
You merit it for your perseverance and courage.
In bocca al lupo!
Gavino
Dear Andrea,
I am glad to read you are able to rest and enjoy life more, and concentrate on the E-Cat X.
Is there any plan for the timing of sharing the results of the test? Some suggest that March 23 (Pons and Fleischmann announcement anniversary) might be selected. What do you think of that guess?
Many thanks!
Frank
Dr. Rossi: I do not understand, why refuel the reactor without knowing f9? (: Really glad to hear you are relaxing just a bit, please not too much, we expect more great things from you!
Dr. Rossi, I was very happy to hear of your new Schedule.
However, I would like to suggest some slight improvements.
Make it 8A to 8P. That is one half of one day.
Take Sunday off.
The World has waited 3,000 Years for your Invention.
I don’t think waiting a few extra weeks is asking too much !
And remember God rested on the seventh day.
I don’t think you can go wrong, following in His footsteps.
Robert Curto
Dear Dr. Rossi, now that the 350-day test is over and you have changed the fuel, I think it is logical to think that the system will continue to function without you, but with the assistance of your first clever Team. If so, the Customer will continue to be happy. Yes I know, you cannot (yet) tell us if your Customer has been happy…
Anyway, we all are happy for and with you.
Happy Regards,
Italo R.
Dear Andrea, I think now we can call us by name, congratulations for the end of the test of E-CAT 1 MW, F9 if you want, but I have no doubt. Now I have a question: what is the minimum power of the industrial E-Cat that can be bought today ? I think this information will be very useful for many of us .
Neri
Dr. Rossi, I would like to suggest your Readers Google:
animpossibleinvention.com
On the website you can also subscribe to their interesting Newsletter.
The Book, An Impossible Invention is now available in Italian.
Robert Curto
Ft. Lauderdale Florida
USA
Winny Depp:
Wake up at 6, go to the Leonardo Corp laboratory to eork on the E-Cat X, at 1 p.m. lunch, then from 2 to 7 p.m. E-Cat X, Physics study, then 1 hour of exercise, then free.
How beautiful sleep during the night!
Warm Regards,
A.R.
JC Renoir:
Yes, you got the mood.
Warm Regards,
A.R.
Dr Andrea Rossi:
After the end of the 350 days test how do you spend yur days?
Cheers,
Winny
Aillas:
1- no, the 2 versions will be fit in different contexts
2- no
Warm Regards,
A.R.
Manuel Cilia:
The E-Cats are designed to be integrated in any existing structure. F9.
Warm Regards,
A.R.