Dr Rossi,
1. Does Einstein’s matter-energy equivalence equation e=m*c*c hold for the SKLep?
2. If so, do you have an understanding or theory as to what matter is lost as the result of the energy produced by the SKLep?
Thank you.
Richard B. Fox
I miei migliori Auguri per un 2022 di grandi successi e soddisfazioni!
Credo di aver capito come viene generata L’elettricita in SKLep…
mm3x3 n.20×20 = cm6x6
Cordiali Saluti Pierino S.
Gavino Mamia:
Yes, we cut off the part related to the SKLed, because, as we explained, we retired the SKLed from the market due to the fall of orders after the presentation of the Ecat SKLep. Almost all the buyers of the SKLed turned their orders to the SKLep.
Warm Regards,
A.R.
Dear Dr. Rossi
If one controller and one SKlep uses approx 1watt of power, if one controller can operate up to 100 SKled does that mean the power usage is still 1 watt or does it go up to 100watts
Martyn Aubrey:
1. It will be fit to suit the kind of asseblies
2. Same as in 1
Thank you for your kind wishes, and we wish you too a Great 2022,
Warm Regards,
A.R.
Looking at the photograph of the Ecat SKLep on the ecat.com website:
1. Does the ECat SKLep use standard DC5521 type connectors (5.5mm X 2.1mm) for the 12v DC input and 12v DC output?
2. Are there matching sockets on the opposing (unseen) face of each Ecat SKLep to enable multiple units to be connected directly together in series in a block (two or more units fitted side to side in a row)?
Many thanks if you can answer.
I wish a Happy New Year to yourself and your excellent team, and great success with the commercial production of the Ecat SKLep in 2022.
You have worked extremely hard to reach this landmark point and, no doubt, will continue to work hard until the Ecat is available across the planet, and beyond!
Caro Dott. Rossi,
qual è la soglia minima per iniziare la produzione degli eCat? Se ad esempio dovesse raggiungere 800.000 ordini e le ordinazioni dovessero poi più o meno fermarsi, che fa? Butta tutto alle ortiche e rinuncia a vendere il suo progetto?
Non posso crederci…
Saluti e buon anno!
Dear Dr. Rossi,
What is the minimum threshold to start production of eCats? If for example you reach 800k orders and the orders more or less stop what will you do? Do you throw everything away and give up to sell your project?
Mats Heijkenskjold:
The case hypothesized by Italo R is that of an Ecat SKLep whose 12 V DC output is turned by an inverter to 220 V 50 Hz AC, that, obviously, implies a sinusoidal wave. As for what we deliver, it depends on the specific situations of the Clients, that will be discussed just before we deliver the Ecat SKLeps. I don’t think that normally we will deliver the inverters, since they can be bought directly by the Clients, but, again, we are not discussing here the specific instructions that our Clients will have when we will be ready to deliver.
Happy New year also to you !
Warm Regards,
A.R.
Dear Dr Andrea Rossi,
Congratulations for collecting so far the remarkable level of 300000 Ecat SKLeps sold. You, as well as your great team, merited it after the convincing demonstration of December 9th, available also on http://www.ecat.com
The stunning skyrocketing readings on RG of http://www.researchgate.net/publication/330601653_E-Cat_SK_and_long_range_particle_interactions
after the presentation of the Ecat SKLed confirms the strong effect of it.
May the New Year bring you the first million of units ordered, so that the global diffusion of your creature can start soon.
Best,
Udo
Dear Mr. Rossi,
Mr. Pekka Panhunen is right. Please more videos who explain the boxed SKLEP.
You can show how it is assembled to 20 boxes to run an electric fire, or 1 box to run a lamp, charge a battery of an electric car and so on.
Best regards
Franz V.
as you can read in the link below, AC75 sailboats need a good deal of electric energy, stored in heavy batteries, for maneuvering their foiling arms.
Which team would you like to win the next America’s Cup? Just choose one and give them a few SKLeps 😉
Camillo Urbani:
Thank you for your attention to our work.
It is possible to assemble units of 100 W to reach MWs.
We have to assemble 10000 units to reach 1 MW. We already got orders for this assembly range.
If your acquaintance is really interested can reach me: info@leonardocorp1996.com
Warm Regards,
A.R.
Warm Regards,
A.R.
Dear Andrea,
If you need to accelerate sales, one way is to make a new presentation where the AI is boxed. From this point of view, it was wise to leave it unboxed in the Dec 9 presentation.
Best regards, /pekka
Privatamente:Sono Urbani Camillo laurea in Fisica e suo sostenitore nel Blog https://www.facebook.com/groups/235806719875659 Alcuni anni fa ci siamo sentiti per via telefonica. In quella circostanza uno dei più grossi industriale dei sacchetti di plastica spereva di usare E-Cat per produrre energia elettrica. Facemmo una riunione e ci sentimmo per telefono, ma lei in quella occasione disse che era prematura quell’applicazione. Questo amico industriale, tale Bruno Crocco è proprietario di 5 stabilimenti. Poichè il costo dell’eletriccità incide ENORMEMENTE nella sua produzione in quanto usa Megawatt di potenza, da sempre è un tipo MOLTO aperto alle innovazioni e PRONTO a sperimentare. Va da sè che 100 Watt di potenza ovviamente sono irrisori e anche moltiplicandoli mi sembra roccambolesco assemblare migliaia per soddisfare la necessità. Ci sono prospettive future per avere generatori assemblati con molta più potenza? Qualora ci fossero soluzioni può contattarlo. Per il momento io non ho detto nulla in attesa di farli vedere un prototipo funzionante (ne ho già ordinati 10) Comunque lo tenga presente. Indirizzo: Via Monte Ortigara, 37, 36073 Cornedo Vicentino VI Telefono: 0445 428428 Provincia di Vicenza
English synopsis:
Is it realistic to assemble thousands of Ecat SKLeps to reach industrial range energy production ?
Dear Mr Rossi,
don’t you want to produce in asia/china? There are the most consumers, the biggest market. AND no oil industry who want to stop your product.
Best regards
Urs
Some clarifications please, to understand more the impact of converting orders placed by your faithful followers when you started the pre-order cycle for the SKLed.
1) Please confirm you plan to deliver SKLep orders on a first come, first served basis, that is you will ship by order date (assuming you have recieved payment prior to shipping)
2) Can you confirm that the original orders for SKLed that get converted to orders for SKLep will keep the original order date so that your first order supporters will not get pushed out to latter dates. For instance, I was one of the early customers who pre-ordered the SKLed, but now if I switch to SKLep it could be 3+ months after you start shipping that I get my order unless you use the original SKLed order date (100K+ shipped per month, you have 300K orders so far).
3) Please confirm that the SKLep will be serialized as was planned for the SKLed.
4) Please confirm that you will still consider personally signing packing slips for the first supporters who placed early orders. I strongly suspect that many of the first orders for the lamp were just to support you since, as is now proven to be the case, the lamp was more of a proof of technology item than a decorator’s lighting fixture. This is a tough one of course….how many would you sign?
Dr Rossi,
I used to do R&D for the phone company where duplication and hot spare replacement (replacing failed components in a fully functioning system) were absolute requirements, so some things you might consider:
1) Connectorize all connections on the SKlep so that it can be (a) inserted or replaced, if need be, in a matter of seconds and (b) inserted or replaced in a powered-up and running system. Some devices require certain leads to be “connected first and disconnected last” in which case the connector socket needs to be constructed that way.
2) Consider supporting N+1 and N+2 sparing. That is “offline devices” and “failed devices” should act in a benign manner. For instance in a series implementation, a failed device should continue to carry current and in a parallel implementation, a failed device should act like an open-circuit.
3) Provide indicator LED(s) to indicate status of the device (online, offline, failed). (I’m R/G color-impaired; I hate R/G LED indicators; but go ahead and use R/G, everyone else does.)
*** Why do I think duplication, hot spare replacement and fault indicators are important? — A 2KW system will require 20+ devices. A 10KW system (like in a car or home) will require 100+ devices. In those quantities, something’s always having “heartburn” of one sort or another– guaranteed. ***
Caveat: I’m a retired mostly-software guy– talk to your hardware, system architecture and manufacturability experts for the real scoop.
I want to thank you for giving us occasional updates about the numbers of units that have been preordered. It helps us to not have to guess how many preorders have been made.
Dear Andrea: Have you sufficiently solved the inductive load issue with the new AI controller such that the ECAT SKLep can drive an inverter? In this configuration does it matter if the output of the inverter is driving an inductive load? If this is the case are we talking about a custom built Leonardo Corporation Inverter, or any commercial solar energy type inverter? I would like to use a collection of ECAT SKLep units with an inverter to power my house, and the largest part of the load is the Air Conditioner unit which is an inductive load. Thanks for any answers that you can give, and Happy New Year, Barry
I also had a question about the SKLep as shown on http://www.ecat.com.
The label for the Ecat almostly completely covers a large circular recess on the front of the device. Is the purpose of that recessed area confidential?
Hello Andrea, in great long-term expectation of the delivery, I am worried about the shipment … 1. How is a shipment ensured that does not increase financially immeasurably – especially with a view to the possible dangerous allowance? In Germany, shipping potentially hazardous materials such as fireworks costs three times as much as a normal package? 2. Is there a production location in Europe where current orders can be picked up?
I wish you continued success and a good start into 2022
Dear Dr. Rossi,
from what has been said, virtually every person who purchases SKLeps will receive by you customized instructions for installing and using the generators.
But orders for a million pieces and beyond, will require an incredible communication effort on your part to be able to contact hundreds of thousands (or millions) of users in a short time.
My question: will you be equipped with a sufficiently large, numerous and prepared technical structure to deal with this endless mass of contacts and information from and to customers?
Pierino S.:
Sorry, I do not understand what you mean, please explain,
Warm Regards,
A.R.
Richard Fox:
1. To understand the theoretical bases of our technology, please see
http://www.researchgate.net/publication/330601653_E-Cat_SK_and_long_range_particle_interactions
2. n.a.
Warm Regards,
A.R.
Ulrich Kranz:
Thank you for your kind support.
Warm Regards,
A.R.
Dear Andrea,
I analyzed the figures of the SKLep
preorders rising to 400.000.
My estimate is that it could be an exponential development of preorders to reach the 1 million figures early next year.
What I hope!
I wish you a big success and all the best for the year 2022.
Ulrich
Dr Rossi,
1. Does Einstein’s matter-energy equivalence equation e=m*c*c hold for the SKLep?
2. If so, do you have an understanding or theory as to what matter is lost as the result of the energy produced by the SKLep?
Thank you.
Richard B. Fox
I miei migliori Auguri per un 2022 di grandi successi e soddisfazioni!
Credo di aver capito come viene generata L’elettricita in SKLep…
mm3x3 n.20×20 = cm6x6
Cordiali Saluti Pierino S.
Salvatore Boi:
We too wish you all the best for this incoming New Year !
Warm Regards,
A.R.
Albert Ellul:
In the USA and Europe for sure, probably also in Asia.
Warm Regards,
A.R.
Gavino Mamia:
Yes, we cut off the part related to the SKLed, because, as we explained, we retired the SKLed from the market due to the fall of orders after the presentation of the Ecat SKLep. Almost all the buyers of the SKLed turned their orders to the SKLep.
Warm Regards,
A.R.
SMG:
We are close to 400000 units ordered, as for today.
Warm Regards,
A.R.
Dear Dr Rossi,
Can you update us about how many units of the Ecat SKLep have been ordered within 2021 ?
Silent Majority Guy
Mi sono accorto ora che ci sono due versioni del video della presentazione
https://www.youtube.com/watch?v=r4_NyyIZq70
https://www.youtube.com/watch?v=Kx54nYgKfNg
Hai rimosso la parte dell’SKLed…
Buon lavoro
I realized now that there are two versions of the presentation video
https://www.youtube.com/watch?v=r4_NyyIZq70
https://www.youtube.com/watch?v=Kx54nYgKfNg
You have removed the SKLed part …
good job
Dear Dot. Rossi,
Will the production of the 100W E-Cat SKLep commence in both the USA and Europe once the million mark is reached?
Will it commence in other continents too?
I wish you the best new year, I wish may could be the start of production and selling of E-CAT SKLep in whole world.
Manuel Cilia:
Goes up to about 100 W
Warm Regards,
A.R.
Dear Dr. Rossi
If one controller and one SKlep uses approx 1watt of power, if one controller can operate up to 100 SKled does that mean the power usage is still 1 watt or does it go up to 100watts
Thank you
Martyn Aubrey:
1. It will be fit to suit the kind of asseblies
2. Same as in 1
Thank you for your kind wishes, and we wish you too a Great 2022,
Warm Regards,
A.R.
Enzo Amato:
Obviously good sense will be applied,
Warm Regards,
A.R.
Dear Dr Rossi,
Looking at the photograph of the Ecat SKLep on the ecat.com website:
1. Does the ECat SKLep use standard DC5521 type connectors (5.5mm X 2.1mm) for the 12v DC input and 12v DC output?
2. Are there matching sockets on the opposing (unseen) face of each Ecat SKLep to enable multiple units to be connected directly together in series in a block (two or more units fitted side to side in a row)?
Many thanks if you can answer.
I wish a Happy New Year to yourself and your excellent team, and great success with the commercial production of the Ecat SKLep in 2022.
You have worked extremely hard to reach this landmark point and, no doubt, will continue to work hard until the Ecat is available across the planet, and beyond!
Kind Regards,
Martyn Aubrey
Caro Dott. Rossi,
qual è la soglia minima per iniziare la produzione degli eCat? Se ad esempio dovesse raggiungere 800.000 ordini e le ordinazioni dovessero poi più o meno fermarsi, che fa? Butta tutto alle ortiche e rinuncia a vendere il suo progetto?
Non posso crederci…
Saluti e buon anno!
Dear Dr. Rossi,
What is the minimum threshold to start production of eCats? If for example you reach 800k orders and the orders more or less stop what will you do? Do you throw everything away and give up to sell your project?
I can’t believe it…
Greetings and Happy New Year!
Mats Heijkenskjold:
The case hypothesized by Italo R is that of an Ecat SKLep whose 12 V DC output is turned by an inverter to 220 V 50 Hz AC, that, obviously, implies a sinusoidal wave. As for what we deliver, it depends on the specific situations of the Clients, that will be discussed just before we deliver the Ecat SKLeps. I don’t think that normally we will deliver the inverters, since they can be bought directly by the Clients, but, again, we are not discussing here the specific instructions that our Clients will have when we will be ready to deliver.
Happy New year also to you !
Warm Regards,
A.R.
Dear Andrea,
Italo R asked you the following 27/12:
“in a SKLep with output AC 220V-50Hz, is the waveform perfectly sinusoidal?”
and you answered: “yes”, which puzzled me because I thought SKLep just have an output of 12 V DC.
Is it true that you also deliver inverters to deliver 220 V AC or is it possible
for the SKLep to deliver AC by itself? Could you please explain?
Best regards and Happy New Year!
Mats Heijkenskjold
Udo:
Thank you for your kind support and, likewise, we wish a Great 2022 also to you,
Warm Regards,
A.R.
Dear Dr Andrea Rossi,
Congratulations for collecting so far the remarkable level of 300000 Ecat SKLeps sold. You, as well as your great team, merited it after the convincing demonstration of December 9th, available also on
http://www.ecat.com
The stunning skyrocketing readings on RG of
http://www.researchgate.net/publication/330601653_E-Cat_SK_and_long_range_particle_interactions
after the presentation of the Ecat SKLed confirms the strong effect of it.
May the New Year bring you the first million of units ordered, so that the global diffusion of your creature can start soon.
Best,
Udo
Franz:
Thank you for the suggestion,
Warm Regards,
A.R.
Dear Readers,
Please go to
http://www.rossilivecat.com
to find comments published in other posts of this blog,
Warm Regards,
A.R.
Dear Mr. Rossi,
Mr. Pekka Panhunen is right. Please more videos who explain the boxed SKLEP.
You can show how it is assembled to 20 boxes to run an electric fire, or 1 box to run a lamp, charge a battery of an electric car and so on.
Best regards
Franz V.
Mic71:
Thank you for the link and the suggestion,
We too wish you a Great 2022,
A.R.
Dear Andrea,
as you can read in the link below, AC75 sailboats need a good deal of electric energy, stored in heavy batteries, for maneuvering their foiling arms.
Which team would you like to win the next America’s Cup? Just choose one and give them a few SKLeps 😉
https://www.americascup.com/the-technology
I have been following this blog since the beginning so I wish a 2022 with all the success that you and your team deserve.
BR
Mic
Pekka Janhunen:
The photo of the AI boxed can be seen here:
http://www.ecat.com
Warm Regards,
A.R.
Camillo Urbani:
Thank you for your attention to our work.
It is possible to assemble units of 100 W to reach MWs.
We have to assemble 10000 units to reach 1 MW. We already got orders for this assembly range.
If your acquaintance is really interested can reach me:
info@leonardocorp1996.com
Warm Regards,
A.R.
Warm Regards,
A.R.
Dear Andrea,
If you need to accelerate sales, one way is to make a new presentation where the AI is boxed. From this point of view, it was wise to leave it unboxed in the Dec 9 presentation.
Best regards, /pekka
Privatamente:Sono Urbani Camillo laurea in Fisica e suo sostenitore nel Blog https://www.facebook.com/groups/235806719875659 Alcuni anni fa ci siamo sentiti per via telefonica. In quella circostanza uno dei più grossi industriale dei sacchetti di plastica spereva di usare E-Cat per produrre energia elettrica. Facemmo una riunione e ci sentimmo per telefono, ma lei in quella occasione disse che era prematura quell’applicazione. Questo amico industriale, tale Bruno Crocco è proprietario di 5 stabilimenti. Poichè il costo dell’eletriccità incide ENORMEMENTE nella sua produzione in quanto usa Megawatt di potenza, da sempre è un tipo MOLTO aperto alle innovazioni e PRONTO a sperimentare. Va da sè che 100 Watt di potenza ovviamente sono irrisori e anche moltiplicandoli mi sembra roccambolesco assemblare migliaia per soddisfare la necessità. Ci sono prospettive future per avere generatori assemblati con molta più potenza? Qualora ci fossero soluzioni può contattarlo. Per il momento io non ho detto nulla in attesa di farli vedere un prototipo funzionante (ne ho già ordinati 10) Comunque lo tenga presente. Indirizzo: Via Monte Ortigara, 37, 36073 Cornedo Vicentino VI Telefono: 0445 428428 Provincia di Vicenza
English synopsis:
Is it realistic to assemble thousands of Ecat SKLeps to reach industrial range energy production ?
Urs:
Yes, we will manufacture also in China and Japan.
Warm Regards,
A.R.
Dear Mr Rossi,
don’t you want to produce in asia/china? There are the most consumers, the biggest market. AND no oil industry who want to stop your product.
Best regards
Urs
Albert Ellul:
We will manufacture in the USA the production destined to the Americas and in Europe the production for EU.
Warm Regards,
A.R.
Italo R.:
Yes
Warm Regards,
A.R.
Alexander Brueck:
The Ecat is not a dangerous issue, so no special fees will be applied
I too wish success to you,
Warm Regards,
A.R.
Gregory Daigle:
There is no recess,
Warm Regards,
A.R.
Barry Mead:
Specific installations for specific needs will be discussed with the Clients just before delivery
Warm Regards,
A.R.
Somebody:
OK
Warm Regards,
A.R.
WaltC:
Thank you for your suggestions,
Warm Regards,
A.R.
LarryG:
1- yes
2- yes
3- yes
4- yes
Warm Regards,
A.R.
Happy New Year everyone
Dear Andrea.
Some clarifications please, to understand more the impact of converting orders placed by your faithful followers when you started the pre-order cycle for the SKLed.
1) Please confirm you plan to deliver SKLep orders on a first come, first served basis, that is you will ship by order date (assuming you have recieved payment prior to shipping)
2) Can you confirm that the original orders for SKLed that get converted to orders for SKLep will keep the original order date so that your first order supporters will not get pushed out to latter dates. For instance, I was one of the early customers who pre-ordered the SKLed, but now if I switch to SKLep it could be 3+ months after you start shipping that I get my order unless you use the original SKLed order date (100K+ shipped per month, you have 300K orders so far).
3) Please confirm that the SKLep will be serialized as was planned for the SKLed.
4) Please confirm that you will still consider personally signing packing slips for the first supporters who placed early orders. I strongly suspect that many of the first orders for the lamp were just to support you since, as is now proven to be the case, the lamp was more of a proof of technology item than a decorator’s lighting fixture. This is a tough one of course….how many would you sign?
Best Regards
LarrG
Dr Rossi,
I used to do R&D for the phone company where duplication and hot spare replacement (replacing failed components in a fully functioning system) were absolute requirements, so some things you might consider:
1) Connectorize all connections on the SKlep so that it can be (a) inserted or replaced, if need be, in a matter of seconds and (b) inserted or replaced in a powered-up and running system. Some devices require certain leads to be “connected first and disconnected last” in which case the connector socket needs to be constructed that way.
2) Consider supporting N+1 and N+2 sparing. That is “offline devices” and “failed devices” should act in a benign manner. For instance in a series implementation, a failed device should continue to carry current and in a parallel implementation, a failed device should act like an open-circuit.
3) Provide indicator LED(s) to indicate status of the device (online, offline, failed). (I’m R/G color-impaired; I hate R/G LED indicators; but go ahead and use R/G, everyone else does.)
*** Why do I think duplication, hot spare replacement and fault indicators are important? — A 2KW system will require 20+ devices. A 10KW system (like in a car or home) will require 100+ devices. In those quantities, something’s always having “heartburn” of one sort or another– guaranteed. ***
Caveat: I’m a retired mostly-software guy– talk to your hardware, system architecture and manufacturability experts for the real scoop.
Best Wishes to you and your team,
WaltC
I want to thank you for giving us occasional updates about the numbers of units that have been preordered. It helps us to not have to guess how many preorders have been made.
Dear Andrea: Have you sufficiently solved the inductive load issue with the new AI controller such that the ECAT SKLep can drive an inverter? In this configuration does it matter if the output of the inverter is driving an inductive load? If this is the case are we talking about a custom built Leonardo Corporation Inverter, or any commercial solar energy type inverter? I would like to use a collection of ECAT SKLep units with an inverter to power my house, and the largest part of the load is the Air Conditioner unit which is an inductive load. Thanks for any answers that you can give, and Happy New Year, Barry
Dr Rossi,
I also had a question about the SKLep as shown on http://www.ecat.com.
The label for the Ecat almostly completely covers a large circular recess on the front of the device. Is the purpose of that recessed area confidential?
Warm regards,
Greg
Hello Andrea, in great long-term expectation of the delivery, I am worried about the shipment … 1. How is a shipment ensured that does not increase financially immeasurably – especially with a view to the possible dangerous allowance? In Germany, shipping potentially hazardous materials such as fireworks costs three times as much as a normal package? 2. Is there a production location in Europe where current orders can be picked up?
I wish you continued success and a good start into 2022
Dear Dr. Rossi,
from what has been said, virtually every person who purchases SKLeps will receive by you customized instructions for installing and using the generators.
But orders for a million pieces and beyond, will require an incredible communication effort on your part to be able to contact hundreds of thousands (or millions) of users in a short time.
My question: will you be equipped with a sufficiently large, numerous and prepared technical structure to deal with this endless mass of contacts and information from and to customers?
Kind regards,
Italo R.